Engagement

Five stages, no handovers.

From the first plant visit to the first shift, the same people stay on the account. The team that surveys the site is the team that negotiates and supports it.

Model05 stages
01
First contact
Plant visit, SI introduction or inbound request
02
Assessment
Measured site, documented constraints
03
Concept
Equipment mix, layout, cost model
04
Close
Terms, documentation, schedule
05
After
Start-up support, named contact
02 / The model

What happens, in order.

01

First contact

A plant or warehouse visit, an SI introduction, or an inbound request. We qualify in person, on site, with the people who will use the equipment.

02

Site assessment

Aisles, loads, shifts, interfaces, power, network. Measured and recorded, with the constraints that change the design called out first.

03

Concept and cost

Equipment mix, layout, total cost of ownership and the compliance path. Presented in English, to the people who sign.

04

Commercial close

Terms, documentation and delivery schedule, negotiated by the team that did the survey.

05

Start-up and after

Support through start-up, then one named contact for the life of the equipment.

03 / Deliverables

What a site assessment produces.

01

Site survey findings

Measured constraints, with the ones that change the design called out first.

02

Material-flow concept

From receiving to shipping, drawn as it runs today and as it would run after.

03

Equipment shortlist

Two or three options, with the trade-off between them stated in plain terms.

04

Cost model

Purchase, consumables, service and downtime, over the horizon you actually plan on.

05

Compliance checklist

What has to be true before the equipment can legally be put into service.

04 / Who is on the ground

Three roles, no handover.

  • 01The engineer who surveys The same person presents the concept to your team. Nothing is re-explained to a new account manager.
  • 02The negotiator Commercial terms are handled by someone who has stood in the building.
  • 03The local contact After start-up, one named person — not a ticket queue and not a distributor.

We do not publish response-time promises we cannot hold. The scope of a site assessment is agreed before anyone travels.

05 / Buyer questions

How the engagement actually runs.

The three questions that decide whether a project starts well: who visits, what comes back in writing, and who is still there after handover.

01What happens on the first visit?

We walk the plant with the people who will use the equipment: aisles, loads, shifts, interfaces, power and network. The constraints that change the design are called out first, before any price is discussed.

02What do we get in writing at each stage?

A documented set of measured constraints after the assessment, an equipment mix with layout and cost model at concept, then terms, documentation and schedule at close.

03Who is still there after start-up?

The same team. The people who surveyed the site stay on the account for start-up support, with a named contact rather than a shared inbox.

Start with the floor. Everything else follows.

Book a site assessmentSite visit / scope first